Thailand Training Center

MBI’s 6,768 sq ft Teaching Center for Xin Chun SDA Church and AWR unites learning, media, dining, and student housing into one mission-focused building.
Client: Adventist World Radio
Year: 2025
Chang Mai, Thailand
MBI is designing a 6,768 sq ft Teaching Center for the Xin Chun SDA Church campus in partnership with Adventist World Radio (AWR). The building consolidates classrooms, a multipurpose hall, an AWR media suite, dining and support spaces, and dedicated student housing. Locally built to high construction and life-safety standards, it streamlines operations, enables on-site residential programs, and frees existing campus rooms for expanded ministry and classroom use.

Need & Opportunity
MBI will partner with Xin Chun SDA Church and Adventist World Radio (AWR) to deliver a new 6,768 sq ft Teaching Center. The campus currently operates instruction, housing, dining, and media from scattered, improvised spaces. There is a need to consolidate those functions on the available open area into a single purpose-built building with dedicated student housing, classrooms, a multipurpose hall, an AWR media suite, and dining/support spaces. This consolidation will centralize programs, enable on-site residential training, simplify daily operations, and free existing buildings for expanded classrooms and ministry use.

Solution & Value Added
MBI is designing and delivering a 6,768 sq ft Teaching Center that consolidates instruction, media, assembly, dining, support, and housing into one efficient building:

  • Learning & Assembly (classrooms + multipurpose hall): Increases instructional capacity, supports gatherings and events, and frees existing church spaces for Sabbath school and discipleship.
  • Media & IT (AWR recording suite + equipment room): Provides on-site production and a campus communications hub to streamline content creation and outreach.
  • Resident Support & Services (kitchen, cafeteria, reception, residential suites, toilets/laundry): Simplifies daily logistics, supports visiting teams and staff, and enables longer on-site programs.
  • Durable Local Construction with High Standards: Uses local building technology and trades for efficient delivery while meeting rigorous construction quality, code compliance, and life-safety performance.

 

MBI’s role is end-to-end design and construction oversight. We translate AWR’s program into a mission-oriented, code-compliant facility that consolidates operations and strengthens campus life.